How much does it cost to charge a MG ZS EV at home?
A full home charge of the MG ZS EV Long Range (2021-2025) costs about £20.26 at the July 2026 Ofgem price cap (26.11p/kWh) — that is 7.4p per mile. The typical 20–80% top-up costs £12.16.
Prices based on the Ofgem price cap of 26.11 p/kWh, effective 1 July 2026.Source: Ofgem
Full charge
£20.26
at the Ofgem price cap
Running cost
7.4p /mile
at 4 mi/kWh incl. losses
20–80% on a 7 kW wallbox
5 hr 51 min
costing £12.16
Charging cost by tariff
| Tariff | Full charge | 20–80% | Per mile |
|---|---|---|---|
| Ofgem price cap26.11 p/kWh | £20.26 | £12.16 | 7.4p |
| Octopus Go 12M Fixed off-peak (London example)9.50 p/kWh | £7.37 | £4.42 | 2.7p |
| Intelligent Octopus Go 12M Fixed off-peak (London example)8.00 p/kWh | £6.21 | £3.73 | 2.3p |
Costs include the ~12% energy lost during AC charging, so they reflect what your meter records. Off-peak rates assume all charging happens inside the cheap window; rates vary by region. These are comparisons of published rates, not tariff recommendations.
How the ZS EV compares on running cost
Pence per mile at the Ofgem price cap. Shorter is cheaper.
Charging time by charger type
| Charger | Speed for this car | 20–80% | Empty to full |
|---|---|---|---|
| Three-pin plug (2.3 kW) | 2.3 kW | 17 hr 49 min | 29 hr 42 min |
| 3.6 kW wallbox | 3.6 kW | 11 hr 23 min | 18 hr 58 min |
| 7 kW wallbox | 7 kW | 5 hr 51 min | 9 hr 45 min |
| 22 kW three-phase | 11 kWlimited by the car | 3 hr 44 min | 6 hr 13 min |
Times are simple energy-needed ÷ power estimates. Real sessions can run a little longer, because charging slows as the battery approaches full.
What affects these numbers for the MG ZS EV
This car charges at up to 11 kW on AC
The MG ZS EV's onboard charger accepts at most 11 kW from an AC connection. A 22 kW three-phase cannot charge it any faster than that, so there is no benefit in paying for a more powerful home charger than the car can use.
A three-pin plug is a backup, not a plan
From a standard three-pin socket (2.3 kW), an empty-to-full charge of the 68.3 kWh battery takes about 29 hr 42 min. Fine for overnight top-ups, but impractical as your only way to charge.
Typical EV efficiency
4 miles per kWh is in the normal range for a modern EV, so the MG ZS EV's running cost per mile mostly depends on your electricity rate.
Real-world figures vary
The 273-mile range is the official WLTP lab figure. Cold weather and motorway speeds reduce real-world efficiency, which raises cost per mile and lowers range. Treat these numbers as good estimates, not promises.
The 92 kW DC figure is not for home charging
DC rapid charging at up to 92 kW only happens at public rapid chargers. All home charging is AC, so it is the 11 kW AC limit that matters for the times on this page.
MG ZS EV Long Range— specifications used
- Usable battery
- 68.3 kWh
- WLTP range
- 273 miles
- Efficiency
- 4 mi/kWh
- Max AC charging
- 11 kW
- Max DC charging
- 92 kW
- Connector
- Type 2 / CCS
Data source: MG UK ZS EV materials checked 2026-07-20; MG quotes an 11 kW three-phase onboard charger - UK single-phase homes charge at ~7 kW in practice; some sources quote 94 kW DC